Pick your plan, pick your week, and our crew shows up. Spring start-ups from April through June, winterizations from August through October.
Every opening gets your system reassembled, started, and swim-ready. Pick the plan that matches your pool:
Safety cover removed and folded, equipment reassembled, lines reconnected, system started, and start-up chemicals added.
Book This PlanThe full open for pools under solid or tarp covers — extra hands, pumping, and cleanup included.
Book This PlanEquipment reassembly and system start-up for straightforward pools.
Book This PlanVacuum out, wipe and sanitize the interior, safety-test electrical, assemble pumps, clean filters, refill, and start the system.
Book This PlanOld sand out, filter cleaned and inspected, fresh sand in. Recommended every two years.
Add to My OpeningWhen swimming season winds down, a proper winterization protects your pool from freezing temperatures, equipment damage, and debris — so spring opens easy.
Remove ladders, rails, and jets. Disconnect equipment, blow lines, add anti-freeze, install your safety cover, and add shock and algaecide.
Book This PlanDisconnect equipment and lines, remove ladders, add chemicals, and install your cover. Customer drains pool as far as possible in waste mode.
Book This PlanVacuum out, wipe off the interior, and sanitize the spa. Safety-test electrical, assemble pumps, clean filters, refill, and restart the system.
Book This PlanIncludes up to 200 lbs of filter sand. Old sand removed, filter cleaned, system inspected, new sand added. (Old or weakened laterals may break during a sand change; we are not responsible for same.)
Add to My ClosingWe winterize your city water fill line so it's protected through the freeze.
Add to My ClosingMaintenance plans, repairs, water testing, and everything in between.